Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\suryagoldcement.com\httpdocs\blog\wp-includes\functions.php on line 6114
Best Time to Start House Construction in India } Surya Cement




Best Time to Start House Construction in INDIA

A home is more than just a structure made of brick and mortar. It is the place where you live with your family, enjoy the moments you live, and make memories to cherish forever. For starting construction work, one needs proper knowledge and experience in this field. Whether you start new construction or renovation work, proper research to choose the best time and knowledge is required in this field.

Not only this, when you ultimately start construction work, many factors play an important while building a home.

Factors that you should take into consideration while constructing homes

Weather to choose for Construction

Before starting any construction work, one must consider the ideal time for starting the work. India is a place where weather conditions differ from place to place. During summer, the temperature gets high and then downpours during monsoons. These are the things that should be considered during house construction.

  • An excessive amount of heat saps away the moisture inside the concrete, which is required to ensure its strength.
  • Monsoon creates a big challenge while executing construction work. Due to water logging or additional pumping system, it drains out clogged water. In many cases, soil collapse.
  • During monsoon time, the soil quality varies a lot and it should be stored properly to avoid excessive moisture. Proper storage for cement is also required.
  • Concreting can delay during the rainy season as it may cause a loss of strength in cement.
  • The hydration process also gets slower during low temperatures, and therefore, extra precaution is required to achieve the required amount of strength during construction.

Availability of the Labour

Along with the weather, labour availability is an important factor that should be considered. Once you have finalized the work, you need to confirm whether there is enough availability of labour or not. The labourers are mostly migrated from small villages and towns, and therefore, some important factors need to be considered –

  • The availability of labour becomes low during the festive seasons, and therefore, your construction will be delayed.
  • The availability of labour will be low during sowing and reaping crops. Many labourers come to cities from villages and rural areas and return to their homes during harvest time.

Price and Quality of Materials 

The quality of raw materials and their availability must be checked while starting construction. Construction activities, weather, and government order greatly impact the prices of raw materials. It would help if you started stocking certain materials that you think their price will increase in a few months.

Like other materials, finding the best quality cement is also important. Good quality raw materials and proper construction techniques increase the longevity of the construction.

Best Seasons to Start House Construction in INDIA

Rainy Season for Construction Work

If you go for construction during the rainy season, it will require at least 3 to 4 months to execute the entire construction work. Even if the design process is initiated during the monsoon season, the construction should start with proper precautions and measures. However, if your execution work starts during the monsoon, the following safety measures must be taken into consideration as

  • Proper waterproofing area for cement storage
  • Temporary electrical connection should be set up during construction
  • Arrangement of water pumps required to remove clogged water from the site

The monsoon can be a great time to start construction work if you are done with all safety measures.

Winter Season For Construction Work

The winter season in India starts from November and lasts until February. This season is considered ideal for house construction as the weather conditions are favorable. The temperatures are cool and dry, and there is very little rainfall. This means that the cement used for construction can dry and set more effectively, ensuring the strength and durability of the structure.

Moreover, the winter season is also a relatively less busy time for construction workers and contractors, which means that the labor costs may be lower during this period. This makes it an ideal time to start construction for those who are looking to save some money on labor costs.

Summer Season For Construction Work

The summer season in India starts from March and lasts until June. While the temperatures during this season can be scorching, it is still an ideal time for house construction. The dry weather conditions during the summer season make it easier for the cement to set and harden effectively.

Moreover, the summer season is also an ideal time to start construction for those who want to avoid the monsoon season, which usually starts in late June or early July. The monsoon season can cause delays in construction and can also affect the quality of the cement used for construction.

Best month to start house construction in India

The best time to start house construction in India is during the winter months, between October to February. During this period, the weather is mild, and the humidity levels are relatively low, making it an ideal time for construction work. Additionally, there is little to no rainfall during these months, which can reduce the risk of damage to the construction site and the materials used in the construction.

FAQs

What day is good in month june and july for Bhoomi pooja?

In June and July, there are several auspicious days that you can consider for Bhoomi pooja according to the Hindu calendar. Here are some of the dates that are considered good for Bhoomi pooja during this period:

June 2023:

  • June 5, 2023 (Monday)
  • June 7, 2023 (Wednesday)
  • June 12, 2023 (Monday)
  • June 15, 2023 (Thursday)
  • June 16, 2023 (Friday)
  • June 19, 2023 (Monday)
  • June 20, 2023 (Tuesday)
  • June 23, 2023 (Friday)
  • June 26, 2023 (Monday)

JULY 2023

  • July 1, 2023 (Saturday)
  • July 3, 2023 (Monday)
  • July 4, 2023 (Tuesday)
  • July 7, 2023 (Friday)
  • July 10, 2023 (Monday)
  • July 11, 2023 (Tuesday)
  • July 12, 2023 (Wednesday)
  • July 14, 2023 (Friday)
  • July 17, 2023 (Monday)
  • July 21, 2023 (Friday)
  • July 28, 2023 (Friday)

 

 

About the author

I am Civil Engineer and with over 15 years of experience in the industry, I have the expertise and knowledge to tackle any civil engineering project. From designing and building infrastructure to overseeing construction projects, I have the skills and abilities to get the job done right.